Build DetailsWed @ 1:40pm
- 00:15
- Install Crank
- 01:21
- Front Seal & Timing Belt
- 02:41
- Install Motorplate
- 05:43
- Rear Seal & Flywheel
- 06:46
- Mains Torqued
- 11:46
- Install Pistons, Rod Caps and Bolts
- 12:08
- Torque Rod Bolts
- 12:36
- Oil Pump and Oil Lines
- 13:37
- Oil Pan & Starter
- 13:39
- Flipped
- 14:28
- Lifters
- 15:38
- Align Timing Mark & Cam Sensor
- 15:57
- Dampener / Carbon Fiber Shield
- 19:05
- Heads On - Nuts Run Down & torque
- 20:30
- Rocker Bars
- 23:29
- Valley Tray
- 26:48
- Pushrods & Rocker Arms & Torque
- 27:37
- Manifold
- 28:45
- Headers
- 29:17
- Valve Covers
- 29:27
- Coil Packs / Plug Wires
- 29:33
- Crank Trigger / TPS / Cam Sensor Leads / Fuel Line
- 29:38
- Start Engine & Air Cleaner
- 29:42
- Fired Up
- 31:10
- Build Finished
clock30:42.00
penalty00:00.00
official time30:42.00