

Jared Morris&Kyle Kittell
Build DetailsWed @ 1:30pm
- 00:04
- Install Crank
- 02:25
- Front Seal & Timing Belt
- 03:15
- Rear Seal & Flywheel
- 03:44
- Install Motorplate
- 05:54
- Mains Torqued
- 08:52
- Install Pistons, Rod Caps and Bolts
- 09:17
- Torque Rod Bolts
- 10:17
- Oil Pump and Oil Lines
- 10:21
- Oil Pan & Starter
- 10:23
- Flipped
- 11:13
- Lifters
- 12:48
- Align Timing Mark & Cam Sensor
- 12:52
- Dampener / Carbon Fiber Shield
- 15:15
- Heads On - Nuts Run Down & torque
- 15:58
- Rocker Bars
- 19:33
- Valley Tray
- 19:44
- Pushrods & Rocker Arms & Torque
- 21:25
- Headers
- 21:30
- Valve Covers
- 22:28
- Manifold
- 23:20
- Crank Trigger / TPS / Cam Sensor Leads / Fuel Line
- 23:23
- Coil Packs / Plug Wires
- 23:25
- Start Engine & Air Cleaner
- 23:27
- Fired Up
- 24:27
- Build Finished
clock24:25.60
penalty03:30.00
Penalty Comments
4x30 Loose Valve Cover Nuts
1x30 Cross-Threaded Valve Cover Nuts
2x30 Loose Balance Cover Nuts
official time27:55.60